FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct rebox framing following Figure 2
for your specic installation requirements. See Figure 3 on Page 8 for rebox dimensions. The framing headers may
rest on the top of the rebox standoff.
The rebox may be installed directly on a combustible oor or raised on a platform of an appropriate height. When the rebox
is installed directly on carpeting, tile, or other combustible material, other than wood ooring, the rebox shall be installed on a
metal or wood panel extending the full width and depth of the enclosure.
Figure 2 - Framing Dimensions
Do not fill spaces around firebox with insulation
or other materials. This could cause a fire.
WARNING
NON-COMBUSTIBLE
COMBUSTIBLE
COMBUSTIBLE
40"
15.50"
-5 - For more information, visit www.desatech.com
Minimum non-combustible material across the facing is 41.75" wide and 40" tall.
NON-COMBUSTIBLE
53-1/2"
40-1/2"
COVERING FACES
22-3/4"
OF MODEL 91 FIREPLACE
(58 cm)
(103 cm)
MIN.
(136 cm)
41.75"
7.5"
22-3/4
"
40-1/2"
MIN.
AS REQUIRED BY DESIGN
AS LONG AS CEILING
CLEARANCE IS MAINTAINED
PLATFORM MUST BE
SOLID, FLAT, AND
FULLY SUPPORTED
52-3/4"
(103cm)
(58cm)
(134
cm)
22-3/4"
(58
cm)
52-3/4"
(134 cm
40-1/2"
(103cm)
MODEL 91 FIREPLACE FRAMING
MODEL 92 FIREPLACE FRAMING (raised)
MODEL 92 FIREPLACE FRAMING
)
MIN.